Jaehn, F., Pesch, E., Cichenski, M., Pawlak, G., Blazewicz, J., & Singh, G. (2017). An integrated model for the transshipment yard scheduling problem. Journal of Scheduling, 20(1), 57. https://doi.org/10.1007/s10951-016-0470-4
Chicago Style (17th ed.) CitationJaehn, Florian, Erwin Pesch, Mateusz Cichenski, Grzegorz Pawlak, Jacek Blazewicz, and Gaurav Singh. "An Integrated Model for the Transshipment Yard Scheduling Problem." Journal of Scheduling 20, no. 1 (2017): 57. https://doi.org/10.1007/s10951-016-0470-4.
MLA (9th ed.) CitationJaehn, Florian, et al. "An Integrated Model for the Transshipment Yard Scheduling Problem." Journal of Scheduling, vol. 20, no. 1, 2017, p. 57, https://doi.org/10.1007/s10951-016-0470-4.
Warning: These citations may not always be 100% accurate.