APA (7th ed.) Citation

Gao, S., Xie, H., Yang, M., Zhang, Q., Zhang, M., Wang, X., & Jiang, Z. (2023). A BIM-Based Simulation Approach for Life-Cycle Quality Control in Post-Pandemic Hospitals. Buildings (2075-5309), 13(6), 1549. https://doi.org/10.3390/buildings13061549

Chicago Style (17th ed.) Citation

Gao, Si, Hu Xie, Mian Yang, Qiang Zhang, Ming Zhang, Xin Wang, and Ze-Hao Jiang. "A BIM-Based Simulation Approach for Life-Cycle Quality Control in Post-Pandemic Hospitals." Buildings (2075-5309) 13, no. 6 (2023): 1549. https://doi.org/10.3390/buildings13061549.

MLA (9th ed.) Citation

Gao, Si, et al. "A BIM-Based Simulation Approach for Life-Cycle Quality Control in Post-Pandemic Hospitals." Buildings (2075-5309), vol. 13, no. 6, 2023, p. 1549, https://doi.org/10.3390/buildings13061549.

Warning: These citations may not always be 100% accurate.