APA (7th ed.) Citation

Liu, S. Q., Kozan, E., Corry, P., Masoud, M., & Luo, K. (2023). A real-world mine excavators timetabling methodology in open-pit mining. Optimization & Engineering, 24(3), 1493. https://doi.org/10.1007/s11081-022-09741-4

Chicago Style (17th ed.) Citation

Liu, Shi Qiang, Erhan Kozan, Paul Corry, Mahmoud Masoud, and Kai Luo. "A Real-world Mine Excavators Timetabling Methodology in Open-pit Mining." Optimization & Engineering 24, no. 3 (2023): 1493. https://doi.org/10.1007/s11081-022-09741-4.

MLA (9th ed.) Citation

Liu, Shi Qiang, et al. "A Real-world Mine Excavators Timetabling Methodology in Open-pit Mining." Optimization & Engineering, vol. 24, no. 3, 2023, p. 1493, https://doi.org/10.1007/s11081-022-09741-4.

Warning: These citations may not always be 100% accurate.