APA (7th ed.) Citation

Zhong, M., Yue, Y., Zhou, L., & Zhu, J. (2024). Parallel optimization method of train scheduling and shunting at complex high‐speed railway stations. Computer-Aided Civil & Infrastructure Engineering, 39(5), 731. https://doi.org/10.1111/mice.13077

Chicago Style (17th ed.) Citation

Zhong, Mingxuan, Yixiang Yue, Leishan Zhou, and Jianping Zhu. "Parallel Optimization Method of Train Scheduling and Shunting at Complex High‐speed Railway Stations." Computer-Aided Civil & Infrastructure Engineering 39, no. 5 (2024): 731. https://doi.org/10.1111/mice.13077.

MLA (9th ed.) Citation

Zhong, Mingxuan, et al. "Parallel Optimization Method of Train Scheduling and Shunting at Complex High‐speed Railway Stations." Computer-Aided Civil & Infrastructure Engineering, vol. 39, no. 5, 2024, p. 731, https://doi.org/10.1111/mice.13077.

Warning: These citations may not always be 100% accurate.