Shi, X., Wang, Y., Zhou, Z., & Huang, L. (2025). Study on the Optimal Construction Time of Adjacent Pile Foundation Considering the Thermal Stability of the Existing Pile Foundation. Buildings (2075-5309), 15(5), 684. https://doi.org/10.3390/buildings15050684
Chicago Style (17th ed.) CitationShi, Xiangyang, Yunxing Wang, Ziqiang Zhou, and Long Huang. "Study on the Optimal Construction Time of Adjacent Pile Foundation Considering the Thermal Stability of the Existing Pile Foundation." Buildings (2075-5309) 15, no. 5 (2025): 684. https://doi.org/10.3390/buildings15050684.
MLA (9th ed.) CitationShi, Xiangyang, et al. "Study on the Optimal Construction Time of Adjacent Pile Foundation Considering the Thermal Stability of the Existing Pile Foundation." Buildings (2075-5309), vol. 15, no. 5, 2025, p. 684, https://doi.org/10.3390/buildings15050684.