Study on the Design and Construction Methods of Auxiliary Workings for the Deepening of Shaft II in the Borynia Mine.

Saved in:
Bibliographic Details
Title: Study on the Design and Construction Methods of Auxiliary Workings for the Deepening of Shaft II in the Borynia Mine.
Authors: Kamiński, Paweł1, pkaminski@komag.eu, Otto, Aleksandra2, Dawidziuk, Piotr2,3, Dyczko, Artur1,3, Prostański, Dariusz1,2
Source: Applied Sciences (2076-3417); Mar2025, Vol. 15 Issue 6, p3131, 23p
Database: Applied Science & Technology Source
Full text is not displayed to guests.
Be the first to leave a comment!
You must be logged in first