APA (7th ed.) Citation

Lee, J., Lee, S., Kim, Y., & Moon, I. (2025). Design and Validation of an Integrated CAD-to-5D BIM Process for Underground Utilities. Buildings (2075-5309), 15(22), 4139. https://doi.org/10.3390/buildings15224139

Chicago Style (17th ed.) Citation

Lee, Jongseo, Seolhee Lee, Yudoo Kim, and Il-Young Moon. "Design and Validation of an Integrated CAD-to-5D BIM Process for Underground Utilities." Buildings (2075-5309) 15, no. 22 (2025): 4139. https://doi.org/10.3390/buildings15224139.

MLA (9th ed.) Citation

Lee, Jongseo, et al. "Design and Validation of an Integrated CAD-to-5D BIM Process for Underground Utilities." Buildings (2075-5309), vol. 15, no. 22, 2025, p. 4139, https://doi.org/10.3390/buildings15224139.

Warning: These citations may not always be 100% accurate.