APA (7th ed.) Citation

Shen, Z., Guo, J., Dai, F., Cao, Z., & Tian, X. (2025). Face Lag Distance of Large-Section Excavation in Shallow-Buried Closely Spaced Tunnels Under Bias Loading. Applied Sciences (2076-3417), 15(21), 11633. https://doi.org/10.3390/app152111633

Chicago Style (17th ed.) Citation

Shen, Zhen, Jin-Hao Guo, Fa-Ming Dai, Zhi-Lin Cao, and Xiao-Xu Tian. "Face Lag Distance of Large-Section Excavation in Shallow-Buried Closely Spaced Tunnels Under Bias Loading." Applied Sciences (2076-3417) 15, no. 21 (2025): 11633. https://doi.org/10.3390/app152111633.

MLA (9th ed.) Citation

Shen, Zhen, et al. "Face Lag Distance of Large-Section Excavation in Shallow-Buried Closely Spaced Tunnels Under Bias Loading." Applied Sciences (2076-3417), vol. 15, no. 21, 2025, p. 11633, https://doi.org/10.3390/app152111633.

Warning: These citations may not always be 100% accurate.