Ji, B., Xiao, X., Yu, S. S., & Zhang, D. (2026). Min–max regret-based robust makespan minimization of the unrelated parallel batch processing machine scheduling problem with uncertain processing time. Engineering Optimization, 58(6), 1631. https://doi.org/10.1080/0305215X.2025.2527731
Chicago Style (17th ed.) CitationJi, Bin, Xin Xiao, Samson S. Yu, and Dezhi Zhang. "Min–max Regret-based Robust Makespan Minimization of the Unrelated Parallel Batch Processing Machine Scheduling Problem with Uncertain Processing Time." Engineering Optimization 58, no. 6 (2026): 1631. https://doi.org/10.1080/0305215X.2025.2527731.
MLA (9th ed.) CitationJi, Bin, et al. "Min–max Regret-based Robust Makespan Minimization of the Unrelated Parallel Batch Processing Machine Scheduling Problem with Uncertain Processing Time." Engineering Optimization, vol. 58, no. 6, 2026, p. 1631, https://doi.org/10.1080/0305215X.2025.2527731.