Yang, Z., Zhang, H., Xu, Z., & Ge, S. (2026). Integrated Bi-Objective Scheduling of an Assembly Job Shop with Synchronous Assembly, Blocking, and Restricted Material Handling Resources. Applied Sciences (2076-3417), 16(11), 5343. https://doi.org/10.3390/app16115343
Chicago Style (17th ed.) CitationYang, Zhiqi, Hao Zhang, Zhigang Xu, and Shihong Ge. "Integrated Bi-Objective Scheduling of an Assembly Job Shop with Synchronous Assembly, Blocking, and Restricted Material Handling Resources." Applied Sciences (2076-3417) 16, no. 11 (2026): 5343. https://doi.org/10.3390/app16115343.
MLA (9th ed.) CitationYang, Zhiqi, et al. "Integrated Bi-Objective Scheduling of an Assembly Job Shop with Synchronous Assembly, Blocking, and Restricted Material Handling Resources." Applied Sciences (2076-3417), vol. 16, no. 11, 2026, p. 5343, https://doi.org/10.3390/app16115343.