軍, 王., 马浴阳, 翰, 林., 陈伴斌, 帅, 谭., JUN, W., . . . Shuai, T. (2026). 盾构隧道施工场景下的作业人员 非正面人脸识别方法. Urban Mass Transit, 29(6), 109. https://doi.org/10.16037/j.1007-869x.20240326
Chicago Style (17th ed.) Citation軍, 王, et al. "盾构隧道施工场景下的作业人员 非正面人脸识别方法." Urban Mass Transit 29, no. 6 (2026): 109. https://doi.org/10.16037/j.1007-869x.20240326.
MLA (9th ed.) Citation軍, 王, et al. "盾构隧道施工场景下的作业人员 非正面人脸识别方法." Urban Mass Transit, vol. 29, no. 6, 2026, p. 109, https://doi.org/10.16037/j.1007-869x.20240326.
Warning: These citations may not always be 100% accurate.