APA (7th ed.) Citation

Maneechote, T., & Luangpaiboon, P. (2010). Implementation of Lean System on Erbium Doped Fibre Amplifier Manufacturing Process to Reduce Production Time. AIP Conference Proceedings, 1285(1), 372. https://doi.org/10.1063/1.3510562

Chicago Style (17th ed.) Citation

Maneechote, T., and P. Luangpaiboon. "Implementation of Lean System on Erbium Doped Fibre Amplifier Manufacturing Process to Reduce Production Time." AIP Conference Proceedings 1285, no. 1 (2010): 372. https://doi.org/10.1063/1.3510562.

MLA (9th ed.) Citation

Maneechote, T., and P. Luangpaiboon. "Implementation of Lean System on Erbium Doped Fibre Amplifier Manufacturing Process to Reduce Production Time." AIP Conference Proceedings, vol. 1285, no. 1, 2010, p. 372, https://doi.org/10.1063/1.3510562.

Warning: These citations may not always be 100% accurate.