Reducing emissions at Peña: Colorada with schedule optimization.

Saved in:
Bibliographic Details
Title: Reducing emissions at Peña: Colorada with schedule optimization.
Authors: Mena, J. A. Villa1, Schlegel, M.2, Vivas, R. E.3 avilla@pcolorada.com
Source: Mining Engineering. Apr2026, Vol. 78 Issue 4, p28-31. 4p.
Subjects: Iron mining, Scheduling, Scheduling software, Environmental impact analysis, Greenhouse gas mitigation
Geographic Terms: Mexico
Abstract: The article examines Peña Colorada, one of the largest iron mines in Mexico. Topics include project overview, preparation of life-of-mine (LOM) plan at Peña Colorada prior to the implementation of Mine Plan Schedule Optimizer (MPSO), and calculation of the average annual and cumulated avoided emissions for the period of data availability from 2019 to 2023.
Database: Engineering Source
Be the first to leave a comment!
You must be logged in first