Bi-Level Optimal Scheduling for Bundled Operation of PSH with WP and PV Under Extreme High-Temperature Weather.
Saved in:
| Title: | Bi-Level Optimal Scheduling for Bundled Operation of PSH with WP and PV Under Extreme High-Temperature Weather. |
|---|---|
| Authors: | Ma, Wanji1 (AUTHOR), Zhang, Hong1,2 (AUTHOR), Qiao, He1,2 (AUTHOR), Xing, Dacheng1,2 (AUTHOR) 13166917763@163.com |
| Source: | Energies (19961073). May2026, Vol. 19 Issue 9, p2048. 33p. |
| Subject Terms: | *Pumped storage power plants, *Bilevel programming, *Photovoltaic power generation, *High temperature (Weather), *Scheduling, *Renewable energy sources, *Energy industries, *Wind power |
| Abstract: | With the increasing occurrence of extreme high-temperature weather events, the traditional bundled operation of wind power (WP), photovoltaic power (PV), and pumped storage hydropower (PSH) is facing dual challenges, namely intensified renewable energy fluctuations and insufficient flexible regulation capability of PSH. Therefore, this paper proposes an optimal scheduling strategy for bundled operation based on capacity interval matching of PSH with WP and PV under extreme high-temperature weather. First, typical scenarios are generated based on a Time-series Generative Adversarial Network (TimeGAN), and an interval matching transaction model is established based on the forecast intervals of WP and PV capacity and the corrected intervals of PSH capacity. Second, considering PSH as an independent market entity, a bi-level optimization model is constructed, in which the upper-level objective is to maximize the revenue of PSH, while the lower-level objective is to minimize the total cost of the joint clearing of the energy and ancillary service markets. Finally, simulation case studies verify that under extreme high-temperature weather, the proposed optimal scheduling method increases the bundled operation capacity by 17.9% and improves the revenue of PSH in the reserve ancillary service market by 14.8%, thereby effectively enhancing the economic performance of PSH while ensuring the safe and stable operation of the system. [ABSTRACT FROM AUTHOR] |
| Database: | Energy & Power Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: enr DbLabel: Energy & Power Source An: 193715944 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Bi-Level Optimal Scheduling for Bundled Operation of PSH with WP and PV Under Extreme High-Temperature Weather. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Ma%2C+Wanji%22">Ma, Wanji</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Zhang%2C+Hong%22">Zhang, Hong</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Qiao%2C+He%22">Qiao, He</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Xing%2C+Dacheng%22">Xing, Dacheng</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<i> 13166917763@163.com</i> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Energies+%2819961073%29%22">Energies (19961073)</searchLink>. May2026, Vol. 19 Issue 9, p2048. 33p. – Name: Subject Label: Subject Terms Group: Su Data: *<searchLink fieldCode="DE" term="%22Pumped+storage+power+plants%22">Pumped storage power plants</searchLink><br />*<searchLink fieldCode="DE" term="%22Bilevel+programming%22">Bilevel programming</searchLink><br />*<searchLink fieldCode="DE" term="%22Photovoltaic+power+generation%22">Photovoltaic power generation</searchLink><br />*<searchLink fieldCode="DE" term="%22High+temperature+%28Weather%29%22">High temperature (Weather)</searchLink><br />*<searchLink fieldCode="DE" term="%22Scheduling%22">Scheduling</searchLink><br />*<searchLink fieldCode="DE" term="%22Renewable+energy+sources%22">Renewable energy sources</searchLink><br />*<searchLink fieldCode="DE" term="%22Energy+industries%22">Energy industries</searchLink><br />*<searchLink fieldCode="DE" term="%22Wind+power%22">Wind power</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: With the increasing occurrence of extreme high-temperature weather events, the traditional bundled operation of wind power (WP), photovoltaic power (PV), and pumped storage hydropower (PSH) is facing dual challenges, namely intensified renewable energy fluctuations and insufficient flexible regulation capability of PSH. Therefore, this paper proposes an optimal scheduling strategy for bundled operation based on capacity interval matching of PSH with WP and PV under extreme high-temperature weather. First, typical scenarios are generated based on a Time-series Generative Adversarial Network (TimeGAN), and an interval matching transaction model is established based on the forecast intervals of WP and PV capacity and the corrected intervals of PSH capacity. Second, considering PSH as an independent market entity, a bi-level optimization model is constructed, in which the upper-level objective is to maximize the revenue of PSH, while the lower-level objective is to minimize the total cost of the joint clearing of the energy and ancillary service markets. Finally, simulation case studies verify that under extreme high-temperature weather, the proposed optimal scheduling method increases the bundled operation capacity by 17.9% and improves the revenue of PSH in the reserve ancillary service market by 14.8%, thereby effectively enhancing the economic performance of PSH while ensuring the safe and stable operation of the system. [ABSTRACT FROM AUTHOR] |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=enr&AN=193715944 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.3390/en19092048 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 33 StartPage: 2048 Subjects: – SubjectFull: Pumped storage power plants Type: general – SubjectFull: Bilevel programming Type: general – SubjectFull: Photovoltaic power generation Type: general – SubjectFull: High temperature (Weather) Type: general – SubjectFull: Scheduling Type: general – SubjectFull: Renewable energy sources Type: general – SubjectFull: Energy industries Type: general – SubjectFull: Wind power Type: general Titles: – TitleFull: Bi-Level Optimal Scheduling for Bundled Operation of PSH with WP and PV Under Extreme High-Temperature Weather. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Ma, Wanji – PersonEntity: Name: NameFull: Zhang, Hong – PersonEntity: Name: NameFull: Qiao, He – PersonEntity: Name: NameFull: Xing, Dacheng IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 05 Text: May2026 Type: published Y: 2026 Identifiers: – Type: issn-print Value: 19961073 Numbering: – Type: volume Value: 19 – Type: issue Value: 9 Titles: – TitleFull: Energies (19961073) Type: main |
| ResultId | 1 |