P, A., & P, L. (2016). Vertical transportation systems embedded on shuffled frog leaping algorithm for manufacturing optimisation problems in industries. SpringerPlus, 5(1), 831. https://doi.org/10.1186/s40064-016-2449-1
Chicago Style (17th ed.) CitationP, Aungkulanon, and Luangpaiboon P. "Vertical Transportation Systems Embedded on Shuffled Frog Leaping Algorithm for Manufacturing Optimisation Problems in Industries." SpringerPlus 5, no. 1 (2016): 831. https://doi.org/10.1186/s40064-016-2449-1.
MLA (9th ed.) CitationP, Aungkulanon, and Luangpaiboon P. "Vertical Transportation Systems Embedded on Shuffled Frog Leaping Algorithm for Manufacturing Optimisation Problems in Industries." SpringerPlus, vol. 5, no. 1, 2016, p. 831, https://doi.org/10.1186/s40064-016-2449-1.