APA (7th ed.) Citation

Zhang, X., Li, L., Yu, P., & Wu, C. (2024). Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria. Indian Journal of Pure & Applied Mathematics, 55(4), 1499. https://doi.org/10.1007/s13226-023-00454-7

Chicago Style (17th ed.) Citation

Zhang, Xin-gong, Lu Li, Pay-Wen Yu, and Chin-Chia Wu. "Two-agent Single-scheduling Problems of Proportionally-linear Deteriorated Jobs with the Maxi-and-total Cost Criteria." Indian Journal of Pure & Applied Mathematics 55, no. 4 (2024): 1499. https://doi.org/10.1007/s13226-023-00454-7.

MLA (9th ed.) Citation

Zhang, Xin-gong, et al. "Two-agent Single-scheduling Problems of Proportionally-linear Deteriorated Jobs with the Maxi-and-total Cost Criteria." Indian Journal of Pure & Applied Mathematics, vol. 55, no. 4, 2024, p. 1499, https://doi.org/10.1007/s13226-023-00454-7.

Warning: These citations may not always be 100% accurate.