Manufactura justo a tiempo : un enfoque práctico /
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Book |
| Language: | Spanish English |
| Published: |
México :
CECSA,
©1993.
|
| Subjects: |
MARC
| LEADER | 00000nam a2200000 a 4500 | ||
|---|---|---|---|
| 001 | 000031949 | ||
| 003 | CO-BoSNA | ||
| 005 | 20260105155845.0 | ||
| 008 | 020125s1993^^^^mx^a^^^fr^^^^^001^0^spa^d | ||
| 020 | |a 9682612047 | ||
| 040 | |a CO-BoSNA |b spa | ||
| 041 | 1 | |a spa |h eng | |
| 082 | 0 | 4 | |a 658.56 |b H558m |2 23 |
| 100 | 1 | |a Hernández, Arnaldo | |
| 245 | 1 | 0 | |a Manufactura justo a tiempo : |b un enfoque práctico / |c Arnaldo Hernández ; traducido por Jorge Rodríguez R. |
| 260 | |a México : |b CECSA, |c ©1993. | ||
| 300 | |a xx, 250 páginas : |b ilustraciones, diagramas ; |c 23 cm. | ||
| 500 | |a Incluye apéndice | ||
| 504 | |a Incluye bibliografías e índice | ||
| 534 | |p título original |t Just-in-time manufacturing. A practical approach | ||
| 650 | 1 | 7 | |a Justo a tiempo (sistema de manufactura) |2 LEMB |
| 650 | 2 | 7 | |a Control de la producción |2 LEMB |
| 650 | 2 | 7 | |a Control de calidad |2 LEMB |
| 700 | 1 | |a Rodríguez R., Jorge |e traductor | |
| 952 | |0 0 |1 0 |4 4 |6 658_560000000000000_H558M |7 0 |8 GENER |9 145818 |a 11405 |b 11405 |d 2006-04-20 |i 214182 |l 0 |o 658.56 H558m |p 119303018441 |r 2026-01-05 15:58:45 |t Ej. 1 |w 2026-01-05 |y BOOK |z Cra. 13 No. 65-10, Bogotá | ||
| 999 | |c 27947 |d 27947 | ||
| 942 | |6 658_560000000000000__H558M | ||