Conceptos y reglas de lean manufacturing /
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Book |
| Language: | Spanish |
| Published: |
México :
Limusa,
©2008
Instituto Tecnológico y de Estudios Superiores de Monterrey. |
| Edition: | 2a edición |
| Subjects: | |
| Notas Contenido: |
|
MARC
| LEADER | 00000nam a2200000 a 4500 | ||
|---|---|---|---|
| 001 | 000055546 | ||
| 003 | CO-BoSNA | ||
| 005 | 20260107154754.0 | ||
| 008 | 090604s2008^^^^mx^a^^^fr^^^^^000^0^spa^d | ||
| 020 | |a 9786075000053 | ||
| 040 | |a CO-BoSNA |b spa | ||
| 082 | 0 | 4 | |a 658.5 |b V726c |2 23 |
| 100 | 1 | |a Villaseñor Contreras, Alberto | |
| 245 | 1 | 0 | |a Conceptos y reglas de lean manufacturing / |c Alberto Villaseñor, Edber Galindo. |
| 250 | |a 2a edición | ||
| 260 | |a México : |b Limusa, |c ©2008 |b Instituto Tecnológico y de Estudios Superiores de Monterrey. | ||
| 300 | |a 304 páginas : |b ilustraciones ; |c 27 cm. | ||
| 505 | 2 | |a Conceptos de lean manufacturing -- Guía para layout celulares -- Guía para máquinas -- Guía para la administración de materiales -- Guía para el desarrollo del proceso -- Guía para el diseño del layout de la planta -- Guía para el diseño de la estación de trabajo -- Manufactura en masa Vs Lean manufacturing -- Metodología de evaluación -- Los 14 principios del sistema de producción Toyota | |
| 650 | 1 | 7 | |a Administración de la producción |v Manuales |2 Armarc |
| 650 | 1 | 7 | |a Costos de producción |v Manuales |2 Armarc |
| 650 | 1 | 7 | |a Producción en masa |2 Armarc |
| 700 | 1 | |a Galindo Cota, Edber | |
| 952 | |0 0 |1 0 |4 2 |6 658_500000000000000_V726C |7 0 |8 GENER |9 253443 |a 11211 |b 11211 |d 2012-03-16 |i 125129 |l 0 |o 658.5 V726c |p 119211008205 |r 2026-01-07 15:47:54 |t Ej. 1 |w 2026-01-07 |y BOOK |z Calle 15 N° 31 - 42 Piso 2, Centro de Gestión Industrial Bogotá | ||
| 952 | |0 0 |1 0 |4 4 |6 658_500000000000000_V726C |7 0 |8 GENER |9 253444 |a 13218 |b 13218 |d 2013-12-17 |i 110577 |l 0 |o 658.5 V726c |p 139218000863 |r 2026-01-07 15:47:54 |t Ej. 1 |w 2026-01-07 |y BOOK |z Av. Pedro de Heredia, sector Tesca. Cartagena-Colombia | ||
| 952 | |0 0 |1 0 |4 4 |6 658_500000000000000_V726C |7 0 |8 GENER |9 253445 |a 13218 |b 13218 |d 2018-02-10 |i 63615 |l 0 |o 658.5 V726c |p 139218001824 |r 2026-01-07 15:47:54 |t Ej. 2 |w 2026-01-07 |y BOOK |z Av. Pedro de Heredía Sector Tesca, Cartagena | ||
| 952 | |0 0 |1 0 |4 4 |6 658_500000000000000_V726C |7 0 |8 GENER |9 253446 |a 13218 |b 13218 |d 2018-02-10 |i 63615 |l 0 |o 658.5 V726c |p 139218001825 |r 2026-01-07 15:47:54 |t Ej. 3 |w 2026-01-07 |y BOOK |z Av. Pedro de Heredía Sector Tesca, Cartagena | ||
| 952 | |0 0 |1 0 |4 4 |6 658_500000000000000_V726C |7 0 |8 GENER |9 253447 |a 73226 |b 73226 |d 2018-04-06 |i 66974 |l 0 |o 658.5 V726c |p 732260001549 |r 2026-01-07 15:47:54 |t Ej. 1 |w 2026-01-07 |y BOOK |z Cra. 45 Sur No. 141-05, Ibagué | ||
| 999 | |c 51543 |d 51543 | ||
| 942 | |6 658_500000000000000__V726C | ||