La meta : un proceso de mejora continua /
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | , |
| Format: | Book |
| Language: |
Spanish English |
| Published: |
Buenos Aires :
Ediciones Granica,
©2004.
|
| Edition: | 3a edición revisada |
| Series: |
Colección Golbratt
|
| Subjects: |
MARC
| LEADER | 00000nam a2200000 a 4500 | ||
|---|---|---|---|
| 001 | 000059750 | ||
| 003 | CO-BoSNA | ||
| 005 | 20260107162139.0 | ||
| 008 | 951211s2004^^^^ag^^^^^gr^^^^^001^0^spa^d | ||
| 020 | |a 9789506415235 | ||
| 040 | |a CO-BoSNA |b spa | ||
| 041 | 1 | |a spa |h eng | |
| 082 | 0 | 4 | |a 658.5 |b G621m |2 23 |
| 100 | 1 | |a Goldratt, Eliyahu M. | |
| 245 | 1 | 3 | |a La meta : |b un proceso de mejora continua / |c Eliyahu M. Goldratt, Jeff Cox ; traducción, Nicholas Gibler. |
| 250 | |a 3a edición revisada | ||
| 260 | |a Buenos Aires : |b Ediciones Granica, |c ©2004. | ||
| 300 | |a 527 páginas ; |c 22 cm. | ||
| 490 | 0 | |a Colección Golbratt | |
| 534 | |p Título original: |t The goal | ||
| 650 | 1 | 7 | |a Administración de la producción |2 Armarc |
| 650 | 2 | 7 | |a Planificación de la producción |2 Armarc |
| 650 | 2 | 7 | |a Calidad total |2 Armarc |
| 650 | 2 | 7 | |a Cultura organizacional |2 Armarc |
| 700 | 1 | |a Cox, Jeff | |
| 700 | 1 | |a Gibler, Nicholas A. |e traducctor | |
| 952 | |0 0 |1 0 |4 5 |6 658_500000000000000_G621M1 |7 0 |8 GENER |9 309444 |a 05053 |b 05053 |d 2013-03-16 |i 171866 |l 0 |o 658.5 G621m1 |p O53062022489 |r 2026-01-07 16:21:39 |t Ej. 1 |w 2026-01-07 |x Libro retirado de inventario por hongos |y BOOK |z Calle 104 69-120, Medellín | ||
| 952 | |0 0 |1 0 |4 5 |6 658_500000000000000_G621M |7 0 |8 GENER |9 309445 |a 05204 |b 05204 |d 2013-12-26 |l 0 |o 658.5 G621m |p 053062024175 |r 2026-01-07 16:21:39 |t Ej. 1 |w 2026-01-07 |y BOOK |z Cra 29 No. 25-27, Santa Rosa de Osos | ||
| 952 | |0 0 |1 0 |3 Reimpresión 2014 |4 6 |6 658_500000000000000_G621M |7 0 |8 GENER |9 309446 |a 05503 |b 05503 |d 2016-09-20 |i 19824 |l 0 |o 658.5 G621m |p 059503003765 |r 2026-01-07 16:21:39 |t Ej. 1 |w 2026-01-07 |y BOOK |z Cra 48 No. 49-62, Sede Comercio (Rionegro - Antioquia) | ||
| 952 | |0 0 |1 0 |4 5 |6 658_500000000000000_G621M |7 0 |8 GENER |9 309447 |a 11213 |b 11213 |d 2016-10-20 |i 22463 |l 0 |o 658.5 G621m |p 119213002761 |r 2026-01-07 16:21:39 |t Ej. 1 |w 2026-01-07 |x Sin número de inventario, entró por consumo |y BOOK |z Carrera 30 No. 17-91 Sur, Bogotá D.C. | ||
| 952 | |0 0 |1 0 |4 5 |6 658_500000000000000_G621M |7 0 |8 GENER |9 309448 |a 66223 |b 66223 |d 2013-05-02 |l 0 |o 658.5 G621m |p 666223003517 |r 2026-01-07 16:21:39 |t Ej. 1 |w 2026-01-07 |y BOOK |z Transv. 7 Calle 26 - Santa Isabel, Dosquebradas | ||
| 952 | |0 0 |1 0 |4 5 |6 658_500000000000000_G621M |7 0 |8 GENER |9 309449 |a 66223 |b 66223 |d 2013-05-02 |l 0 |o 658.5 G621m |p 666223003518 |r 2026-01-07 16:21:39 |t Ej. 2 |w 2026-01-07 |y BOOK |z Transv. 7 Calle 26 - Santa Isabel, Dosquebradas | ||
| 952 | |0 0 |1 0 |4 6 |6 658_500000000000000_G621M |7 0 |8 GENER |9 309450 |a 68912 |b 68912 |d 2016-04-14 |i 114939 |l 0 |o 658.5 G621m |p 912200001596 |r 2026-01-07 16:21:39 |t Ej. 2 |w 2026-01-07 |x Contrato 1963/2014 - Mundo XXI |y BOOK |z Kilómetro 2 Via a Palogordo, Vereda Guatiguará - Piedecuesta, Santander | ||
| 952 | |0 0 |1 0 |4 6 |6 658_500000000000000_G621M |7 0 |8 GENER |9 309451 |a 68912 |b 68912 |d 2016-04-14 |i 114939 |l 0 |o 658.5 G621m |p 912200001595 |r 2026-01-07 16:21:39 |t Ej. 1 |w 2026-01-07 |x Contrato 1943/2014 - Mundo XXI |y BOOK |z Kilómetro 2 Via a Palogordo, Vereda Guatiguará - Piedecuesta, Santander | ||
| 952 | |0 0 |1 0 |4 6 |6 658_500000000000000_G621M |7 0 |8 GENER |9 309452 |a 68913 |b 68913 |d 2016-11-23 |i 111185 |l 0 |o 658.5 G621m |p 912200002897 |r 2026-01-07 16:21:39 |t Ej. 1 |w 2026-01-07 |x Contrato 1963/2014 - Mundo XXI |y BOOK |z Kilómetro 49 Vía al Mar, El Playón, Santander | ||
| 999 | |c 63747 |d 63747 | ||
| 942 | |6 658_500000000000000__G621M | ||