Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming.

Saved in:
Bibliographic Details
Title: Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming.
Authors: Liu, Shi Qiang1, samsqliu@fzu.edu.cn, Kozan, Erhan2, e.kozan@qut.edu.au, Masoud, Mahmoud3, mahmoud.masoud@qut.edu.au, Li, Debiao1, debiaoli@fzu.edu.cn, Luo, Kai4, k.luo@psbedu.paris
Source: Annals of Operations Research; May2025, Vol. 348 Issue 2, p1-27, 27p
Database: Applied Science & Technology Source
Full text is not displayed to guests.
Description
ISSN:02545330
DOI:10.1007/s10479-022-05134-z