Liu, S. Q., Kozan, E., Masoud, M., Li, D., & Luo, K. (2025). Multi-stage mine production timetabling with optimising the sizes of mining operations: An application of parallel-machine flow shop scheduling with lot streaming. Annals of Operations Research, 348(2), 1. https://doi.org/10.1007/s10479-022-05134-z
Chicago Style (17th ed.) CitationLiu, Shi Qiang, Erhan Kozan, Mahmoud Masoud, Debiao Li, and Kai Luo. "Multi-stage Mine Production Timetabling with Optimising the Sizes of Mining Operations: An Application of Parallel-machine Flow Shop Scheduling with Lot Streaming." Annals of Operations Research 348, no. 2 (2025): 1. https://doi.org/10.1007/s10479-022-05134-z.
MLA (9th ed.) CitationLiu, Shi Qiang, et al. "Multi-stage Mine Production Timetabling with Optimising the Sizes of Mining Operations: An Application of Parallel-machine Flow Shop Scheduling with Lot Streaming." Annals of Operations Research, vol. 348, no. 2, 2025, p. 1, https://doi.org/10.1007/s10479-022-05134-z.