Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming.
Saved in:
| Title: | Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming. |
|---|---|
| Authors: | Liu, Shi Qiang1, samsqliu@fzu.edu.cn, Kozan, Erhan2, e.kozan@qut.edu.au, Masoud, Mahmoud3, mahmoud.masoud@qut.edu.au, Li, Debiao1, debiaoli@fzu.edu.cn, Luo, Kai4, k.luo@psbedu.paris |
| Source: | Annals of Operations Research; May2025, Vol. 348 Issue 2, p1-27, 27p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 02545330 |
|---|---|
| DOI: | 10.1007/s10479-022-05134-z |