Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming.

Saved in:
Bibliographic Details
Title: Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming.
Authors: Liu, Shi Qiang1, samsqliu@fzu.edu.cn, Kozan, Erhan2, e.kozan@qut.edu.au, Masoud, Mahmoud3, mahmoud.masoud@qut.edu.au, Li, Debiao1, debiaoli@fzu.edu.cn, Luo, Kai4, k.luo@psbedu.paris
Source: Annals of Operations Research; May2025, Vol. 348 Issue 2, p1-27, 27p
Database: Applied Science & Technology Source
Full text is not displayed to guests.
FullText Links:
  – Type: pdflink
Text:
  Availability: 1
Header DbId: aci
DbLabel: Applied Science & Technology Source
An: 185099559
AccessLevel: 2
PubType: Academic Journal
PubTypeId: academicJournal
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AU" term="%22Liu%2C+Shi+Qiang%22">Liu, Shi Qiang</searchLink><relatesTo>1</relatesTo>, <i>samsqliu@fzu.edu.cn</i><br /><searchLink fieldCode="AU" term="%22Kozan%2C+Erhan%22">Kozan, Erhan</searchLink><relatesTo>2</relatesTo>, <i>e.kozan@qut.edu.au</i><br /><searchLink fieldCode="AU" term="%22Masoud%2C+Mahmoud%22">Masoud, Mahmoud</searchLink><relatesTo>3</relatesTo>, <i>mahmoud.masoud@qut.edu.au</i><br /><searchLink fieldCode="AU" term="%22Li%2C+Debiao%22">Li, Debiao</searchLink><relatesTo>1</relatesTo>, <i>debiaoli@fzu.edu.cn</i><br /><searchLink fieldCode="AU" term="%22Luo%2C+Kai%22">Luo, Kai</searchLink><relatesTo>4</relatesTo>, <i>k.luo@psbedu.paris</i>
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="JN" term="%22Annals+of+Operations+Research%22">Annals of Operations Research</searchLink>; May2025, Vol. 348 Issue 2, p1-27, 27p
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=aci&AN=185099559
RecordInfo BibRecord:
  BibEntity:
    Identifiers:
      – Type: doi
        Value: 10.1007/s10479-022-05134-z
    Languages:
      – Code: eng
        Text: English
    PhysicalDescription:
      Pagination:
        PageCount: 27
        StartPage: 1
    Titles:
      – TitleFull: Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Liu, Shi Qiang
      – PersonEntity:
          Name:
            NameFull: Kozan, Erhan
      – PersonEntity:
          Name:
            NameFull: Masoud, Mahmoud
      – PersonEntity:
          Name:
            NameFull: Li, Debiao
      – PersonEntity:
          Name:
            NameFull: Luo, Kai
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 15
              M: 05
              Text: May2025
              Type: published
              Y: 2025
          Identifiers:
            – Type: issn-print
              Value: 02545330
          Numbering:
            – Type: volume
              Value: 348
            – Type: issue
              Value: 2
          Titles:
            – TitleFull: Annals of Operations Research
              Type: main
ResultId 1