Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming.
Saved in:
| Title: | Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming. |
|---|---|
| Authors: | Liu, Shi Qiang1, samsqliu@fzu.edu.cn, Kozan, Erhan2, e.kozan@qut.edu.au, Masoud, Mahmoud3, mahmoud.masoud@qut.edu.au, Li, Debiao1, debiaoli@fzu.edu.cn, Luo, Kai4, k.luo@psbedu.paris |
| Source: | Annals of Operations Research; May2025, Vol. 348 Issue 2, p1-27, 27p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: aci DbLabel: Applied Science & Technology Source An: 185099559 AccessLevel: 2 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AU" term="%22Liu%2C+Shi+Qiang%22">Liu, Shi Qiang</searchLink><relatesTo>1</relatesTo>, <i>samsqliu@fzu.edu.cn</i><br /><searchLink fieldCode="AU" term="%22Kozan%2C+Erhan%22">Kozan, Erhan</searchLink><relatesTo>2</relatesTo>, <i>e.kozan@qut.edu.au</i><br /><searchLink fieldCode="AU" term="%22Masoud%2C+Mahmoud%22">Masoud, Mahmoud</searchLink><relatesTo>3</relatesTo>, <i>mahmoud.masoud@qut.edu.au</i><br /><searchLink fieldCode="AU" term="%22Li%2C+Debiao%22">Li, Debiao</searchLink><relatesTo>1</relatesTo>, <i>debiaoli@fzu.edu.cn</i><br /><searchLink fieldCode="AU" term="%22Luo%2C+Kai%22">Luo, Kai</searchLink><relatesTo>4</relatesTo>, <i>k.luo@psbedu.paris</i> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Annals+of+Operations+Research%22">Annals of Operations Research</searchLink>; May2025, Vol. 348 Issue 2, p1-27, 27p |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=aci&AN=185099559 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1007/s10479-022-05134-z Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 27 StartPage: 1 Titles: – TitleFull: Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Liu, Shi Qiang – PersonEntity: Name: NameFull: Kozan, Erhan – PersonEntity: Name: NameFull: Masoud, Mahmoud – PersonEntity: Name: NameFull: Li, Debiao – PersonEntity: Name: NameFull: Luo, Kai IsPartOfRelationships: – BibEntity: Dates: – D: 15 M: 05 Text: May2025 Type: published Y: 2025 Identifiers: – Type: issn-print Value: 02545330 Numbering: – Type: volume Value: 348 – Type: issue Value: 2 Titles: – TitleFull: Annals of Operations Research Type: main |
| ResultId | 1 |