Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria.
Saved in:
| Title: | Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria. |
|---|---|
| Authors: | Hussain, Osama A. I.1, Moehler, Robert C.2, robert.moehler@unimelb.edu.au, Walsh, Stuart D. C.1,3, Ahiaga-Dagbui, Dominic D.1,3 |
| Source: | Infrastructures; May2026, Vol. 11 Issue 5, p173, 30p |
| Database: | Applied Science & Technology Source |
| ISSN: | 24123811 |
|---|---|
| DOI: | 10.3390/infrastructures11050173 |