Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria.

Saved in:
Bibliographic Details
Title: Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria.
Authors: Hussain, Osama A. I.1, Moehler, Robert C.2, robert.moehler@unimelb.edu.au, Walsh, Stuart D. C.1,3, Ahiaga-Dagbui, Dominic D.1,3
Source: Infrastructures; May2026, Vol. 11 Issue 5, p173, 30p
Database: Applied Science & Technology Source
Description
ISSN:24123811
DOI:10.3390/infrastructures11050173