A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces.
Saved in:
| Title: | A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces. |
|---|---|
| Authors: | Wang, Yunrui1, wangyunr2001@xust.edu.cn, He, Xi1, Wang, Haoning1, Sui, Xintong1, Yu, Man1, Zheng, Zhaoyang1 |
| Source: | Journal of Industrial & Management Optimization; 2026, Vol. 22 Issue 4, p1-22, 22p |
| Database: | Applied Science & Technology Source |
| ISSN: | 15475816 |
|---|