Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games.
Saved in:
| Title: | Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games. |
|---|---|
| Authors: | Lu, Ming, Zhang, Yang, Zhang, Jianping |
| Source: | Canadian Journal of Civil Engineering; March 2009, Vol. 36 Issue 3, p473-479, 7p |
| Database: | Applied Science & Technology Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 03151468 |
|---|---|
| DOI: | 10.1139/L08-145 |