Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance.
Saved in:
| Title: | Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance. |
|---|---|
| Authors: | Gai, Chengyang1 (AUTHOR), Wang, Yufang1,2,3,4 (AUTHOR) wangyufang@nuist.edu.cn, Shen, Xiaoning1,2,3,4 (AUTHOR), Zhang, Dianqing1,4 (AUTHOR) |
| Source: | Symmetry (20738994). Apr2026, Vol. 18 Issue 4, p553. 27p. |
| Database: | Academic Search Ultimate |
|
Full text is not displayed to guests.
Login for full access.
|
|
| ISSN: | 20738994 |
|---|---|
| DOI: | 10.3390/sym18040553 |