APA (7th ed.) Citation

Gai, C., Wang, Y., Shen, X., & Zhang, D. (2026). Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance. Symmetry (20738994), 18(4), 553. https://doi.org/10.3390/sym18040553

Chicago Style (17th ed.) Citation

Gai, Chengyang, Yufang Wang, Xiaoning Shen, and Dianqing Zhang. "Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance." Symmetry (20738994) 18, no. 4 (2026): 553. https://doi.org/10.3390/sym18040553.

MLA (9th ed.) Citation

Gai, Chengyang, et al. "Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance." Symmetry (20738994), vol. 18, no. 4, 2026, p. 553, https://doi.org/10.3390/sym18040553.

Warning: These citations may not always be 100% accurate.