Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance.
Saved in:
| Title: | Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance. |
|---|---|
| Authors: | Gai, Chengyang1 (AUTHOR), Wang, Yufang1,2,3,4 (AUTHOR) wangyufang@nuist.edu.cn, Shen, Xiaoning1,2,3,4 (AUTHOR), Zhang, Dianqing1,4 (AUTHOR) |
| Source: | Symmetry (20738994). Apr2026, Vol. 18 Issue 4, p553. 27p. |
| Database: | Academic Search Ultimate |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: asn DbLabel: Academic Search Ultimate An: 193438447 AccessLevel: 2 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Gai%2C+Chengyang%22">Gai, Chengyang</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Wang%2C+Yufang%22">Wang, Yufang</searchLink><relatesTo>1,2,3,4</relatesTo> (AUTHOR)<i> wangyufang@nuist.edu.cn</i><br /><searchLink fieldCode="AR" term="%22Shen%2C+Xiaoning%22">Shen, Xiaoning</searchLink><relatesTo>1,2,3,4</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Zhang%2C+Dianqing%22">Zhang, Dianqing</searchLink><relatesTo>1,4</relatesTo> (AUTHOR) – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Symmetry+%2820738994%29%22">Symmetry (20738994)</searchLink>. Apr2026, Vol. 18 Issue 4, p553. 27p. |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=193438447 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.3390/sym18040553 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 27 StartPage: 553 Titles: – TitleFull: Distributed Dual-Resource Flexible Job Shop Scheduling Considering Multiple Speeds and Preventive Maintenance. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Gai, Chengyang – PersonEntity: Name: NameFull: Wang, Yufang – PersonEntity: Name: NameFull: Shen, Xiaoning – PersonEntity: Name: NameFull: Zhang, Dianqing IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 04 Text: Apr2026 Type: published Y: 2026 Identifiers: – Type: issn-print Value: 20738994 Numbering: – Type: volume Value: 18 – Type: issue Value: 4 Titles: – TitleFull: Symmetry (20738994) Type: main |
| ResultId | 1 |