Identical parallel machine scheduling with tool changes under the peak power consumption constraint.
Saved in:
| Title: | Identical parallel machine scheduling with tool changes under the peak power consumption constraint. |
|---|---|
| Authors: | Li, XiYing1 (AUTHOR), Liu, ChenGuang1 (AUTHOR) liuc@nwpu.edu.cn, Gao, Mengxing1 (AUTHOR) |
| Source: | International Journal of Production Research. Apr2026, p1-17. 17p. 2 Illustrations. |
| Database: | Business Source Ultimate |
| ISSN: | 00207543 |
|---|---|
| DOI: | 10.1080/00207543.2026.2651394 |