Li, X., Liu, C., & Gao, M. (2026). Identical parallel machine scheduling with tool changes under the peak power consumption constraint. International Journal of Production Research, 1. https://doi.org/10.1080/00207543.2026.2651394
Chicago Style (17th ed.) CitationLi, XiYing, ChenGuang Liu, and Mengxing Gao. "Identical Parallel Machine Scheduling with Tool Changes Under the Peak Power Consumption Constraint." International Journal of Production Research 2026: 1. https://doi.org/10.1080/00207543.2026.2651394.
MLA (9th ed.) CitationLi, XiYing, et al. "Identical Parallel Machine Scheduling with Tool Changes Under the Peak Power Consumption Constraint." International Journal of Production Research, 2026, p. 1, https://doi.org/10.1080/00207543.2026.2651394.