This article aimed compare two alternatives for the conceptua- lization of engineering, architectural and construction projects, the first analysis was carried out using Building Information Modeling (BIM), modeling a 5-story multifamily project called Suite 30, establishing a general methodology us...
Saved in:
| Main Author: | |
|---|---|
| Format: | Article |
| Online Access: |
https://revistas.sena.edu.co/index.php/idea/article/view/3055 |